servtec.sr.Zum Inhalt servtec.sr.Zum Inhaltsverzeichnis servtec.sr.Zur Hautpnavigation
Brückner Servtec GmbH
Menu
Home
  • Availability
  • Service
  • Film Quality
  • New Products
  • Brückner ONE
    Back Brückner ONE
    • Brückner ONE Docu
    • Brückner ONE Support
    • Brückner ONE Com
    • Brückner ONE Parts
    • Service Packages
    • Client Request
  • About us
    Back About us
    • Management
    • Team
    • Our Key Values
  • Sustainability
    Back Sustainability
    • Ecological
    • Social
    • Economical
    • Initiative "Yes, we care"
  • Compliance
  • Member Area
  • Brückner TEC Talks
  • News
  • Events
  • Career
  • Brückner Servtec Worldwide
  • Platform Companies
Brückner Servtec GmbH
Königsberger Str. 5-7
83313 Siegsdorf
Germany
+49 8662 63-0
servtec@brueckner.com
  • Members of Brückner Group
    Close
    Brückner Group SE
    LEADING
    TO
    SUCCESS
    Find out more
    Brückner Maschinenbau GmbH
    STRETCHING
    THE
    LIMITS
    Find out more
    KIEFEL GmbH
    DRIVING
    YOUR
    PERFORMANCE
    Find out more
    PackSys Global AG
    CREATING
    PACKAGING TECHNOLOGY
    Find out more
    Further information
  • Member Area
  • Career
  • EN
    Deutsch 中文 Español
  • Close

    Search

    What are you looking for?

Contact us!
Table Of Content
    News | Brückner Servtec
    1. Brückner Servtec
    2. News
    3. Shandong Qunli relies on digitalization platform Brückner ONE
    Follow us:

    Shandong Qunli relies on digitalization platform Brückner ONE

    06 Aug 2024

    First retrofit of the Brückner ONE modules Production and Analytics in an existing film stretching line enabling efficient digital service processing 

    For the first time in the history of Brückner Servtec, an existing BOPP production line was retrofitted with the Brückner ONE modules Production and Analytics. As part of an Integrated Machine Control (IMC) upgrade, the film stretching line of the customer Shandong Qunli Plastics (China) received also a new automation software, enabling a new level of digitalization.   

    Improved efficiency for optimal performance 

    The entire implementation of the software and the digital Brückner ONE products included new IT hardware, such as servers and system control components. For example, the discontinued  B&R system, installed over twenty years ago, was replaced with the latest Siemens control system, including all I/O modules. New user interfaces (for IMC and Brückner ONE) were also installed, ensuring improved line efficiency for optimum performance. 

    Furthermore, additional IMC installations and updates were conducted on numerous other line components, including the thickness gauge or the dosing units on the main extruder in order to implement the most recent technological advancements.  

    Project highlight: Retrofitting the digital Brückner ONE modules 

    A project highlight was the implementation of the two Brückner ONE modules into the existing film stretching line. In contrast to new lines, where they are already part of the system this was the first time they were completely retrofitted. 

    • The Production Module displays all the functions and features of the system software for controlling the plant production. It includes assistance systems such as the Cockpit, covering all relevant information in one page or the Thickness Control Engine (TCE) for measuring the thickness profile. More information on the tool here. 

    • The Analytics Module enables performance tracking of the line and conclusions to be drawn about film production by one click. Included tools are for example, the Recipe Manager (managing existing recipes) or Raw Material Manager (material tracking). More information on the tool here. 

    By retrofitting the two modules, including the desired assistance systems and auxiliary tools, Qunli received the latest digital software developments of Brückner ONE, supporting its system operation and benefiting from increased efficiency, an optimized production process and cost-effectiveness in the long term.  

    Fast upgrade process results in high customer satisfaction  

    The upgrade project was completed within four weeks, after which the production line was successfully restarted on time, a week and a half ahead of schedule. 

    Since the restart the production line has been running smoothly and Mr. Wu Changshuo, Chairman of Shandong Qunli, expressed his satisfaction with the results of the upgrade: “Thanks to Brueckner employees’ hard work, our line takes a new lease of life after the successful IMC upgrade”.  

    Mel Sauer, Installation Supervisor at Brückner Servtec, is also very satisfied and sums up: "The earlier start-up date was mainly due to the good cooperation and the dedicated efforts between Qunli, its personnel and the Brückner colleagues. The customer met our requirements for the installation of the new components very well, which created the basis for the fast recommissioning of the plant.” 

    Brückner Group China Customer Manager Katie Li adds: "We thank Shandong Qunli for their long-standing trust and loyalty in our innovative film stretching services and the good personnel cooperation, which made this project a huge success!”. 

    About Brückner ONE and its modules

    Brückner ONE is the digital touchpoint that supports all aspects of the film stretching line and its operation, coming with seven modules (Support, Documentation, Parts, Communication, Maintenance, Production and Analytics). As part of the IMC upgrade, the last two modules were subsequently installed in the line’s system. More information about the digital platform Brückner ONE can be found here. 

    Successful cooperation between Shandong Qunli Plastics and Brückner | © Brückner
    Successful cooperation between Shandong Qunli Plastics and Brückner
    Brückner ONE Modules | © Brückner
    Brückner ONE Modules

    More News

    This might be interesting for you as well

    20 May 2025

    Customer Days

    Brueckner Group USA Sets a New Global Standard with 2025 Customer Days in Dover, NH
    Read more
    13 May 2025

    Hubei Firsta and Brückner Servtec cooperate for major inline coating upgrade

    Agreement officially signed at Chinaplas 2025
    Read more
    06 May 2025

    Manucor transitions to state-of-the-art twin screw extrusion

    Significantly lower energy consumption and maximized film quality as key benefits 
    Read more
    29 Apr 2025

    Brückner Servtec at Chinaplas 2025

    Sustainable upgrading solutions, optimized operations and local on-site services in the focus 
    Read more
    10 Apr 2025

    Inteplast Group relies on NDC thickness gauge technology

    Brückner Servtec supplies advanced thickness measurement solutions 
    Read more
    11 Mar 2025

    Changzhou Zhongheng successfully upgrades to TDO e-heating register

    Reduced CO2 emissions and less maintenance as key benefits
    Read more
    04 Mar 2025

    Latin American film manufacturer and Brückner Colombia strengthen long-standing partnership

    Read more
    04 Feb 2025

    Diaxon S.A. invests in energy efficiency in film production

    Retrofitted Heat Recovery systems save energy and increase film quality
    Read more
    07 Jan 2025

    Key Position Changes at Brückner Group: Optimal Replacements Through Strategic Personnel Planning

    The Brückner Group, a market leader in engineering of machinery and equipment for processing plastics and alternative materials. Its continuous global success is based on a forward-thinking, long-term personnel strategy. This approach enables the...
    Read more
    Mr. Monojit Bandyopadhya, (middle), Senior Vice President Operations & Country Head, SRF Industries (Thailand) Ltd. and Mr.Kumpol Nateethanasarn,(3rd from left ) Service Director of Brueckner Group Asia- Pacific posed for a photograph with the SRF team in front of the Inline Coater Unit.
    10 Dec 2024

    SRF Industries (Thailand) Ltd. celebrates successful commissioning of first inline coater in Thailand

    Expanded product range and enhanced film quality of BOPP production line
    Read more
    DISCOVER THE Members of Brückner Group
    Contact
    • Locations worldwide
    • Contact form
    Quick Links
    • Login Member Area
    • News Room
    • Subscribe to Newsletter
    • Events
    • Jobs & Career
    • Downloads
    • Terms and Conditions
    • Compliance
    Solutions
    • Availability
    • Service
    • Film Quality
    • New Products
    • All solutions at a glance
    • Brückner ONE Portal Login
    Find us here
    Brückner Servtec GmbH
    • Imprint
    • Disclaimer
    • Privacy statement
    • GDPR Information
    © Copyright 2025 Brückner Servtec GmbH