servtec.sr.Zum Inhalt servtec.sr.Zum Inhaltsverzeichnis servtec.sr.Zur Hautpnavigation
Brückner Servtec GmbH
Menu
Home
  • Availability
  • Service
  • Film Quality
  • New Products
  • Brückner ONE
    Back Brückner ONE
    • Brückner ONE Docu
    • Brückner ONE Support
    • Brückner ONE Com
    • Brückner ONE Parts
    • Service Packages
    • Client Request
  • About us
    Back About us
    • Management
    • Team
    • Our Key Values
  • Sustainability
    Back Sustainability
    • Ecological
    • Social
    • Economical
    • Initiative "Yes, we care"
  • Compliance
  • Member Area
  • Brückner TEC Talks
  • News
  • Events
  • Career
  • Brückner Servtec Worldwide
  • Platform Companies
Brückner Servtec GmbH
Königsberger Str. 5-7
83313 Siegsdorf
Germany
+49 8662 63-0
servtec@brueckner.com
  • Members of Brückner Group
    Close
    Brückner Group SE
    LEADING
    TO
    SUCCESS
    Find out more
    Brückner Maschinenbau GmbH
    STRETCHING
    THE
    LIMITS
    Find out more
    KIEFEL GmbH
    DRIVING
    YOUR
    PERFORMANCE
    Find out more
    PackSys Global AG
    CREATING
    PACKAGING TECHNOLOGY
    Find out more
    Further information
  • Member Area
  • Career
  • EN
    Deutsch 中文 Español
  • Close

    Search

    What are you looking for?

Contact us!
Table Of Content
    News | Brückner Servtec
    1. Brückner Servtec
    2. News
    3. Changzhou Zhongheng successfully upgrades to TDO e-heating register
    Follow us:

    Changzhou Zhongheng successfully upgrades to TDO e-heating register

    11 Mar 2025

    Reduced CO2 emissions and less maintenance as key benefits

    Our Chinese customer Changzhou Zhongheng (Changzhou City, Jiangsu Province) have been using their film stretching line GOL to produce high-quality BOPET packaging film since 2005. In order to be able to continue operating the 20-year-old production line for another 20 years in the future, they have recently invested in a modernization of the system oven and its ventilation.

    Faced with the challenge that the film stretching line was being operated increasingly inefficiently compared to today's plant standards, Brückner’s support was requested. High CO2 emissions increased operating costs and environmental impact, and old oil supply pipes, valves, temperature sensors and broken cables jeopardized production safety.  

    Therefore the aim of the upgrade was to reduce CO2 emissions, for which Brueckner Group China, on behalf of Brückner Servtec, provided a solution: replacing the oil heating coils of the transverse direction orientation (TDO) and outdoor ventilation with modern, electric heating coils which require less maintenance.

    Thanks to Brueckner Group China's proximity to the Chinese customer, the upgrade was carried out directly by the colleagues on site. This not only saved considerable time and costs, but also had the advantage that coordination could be carried out directly in the same language - true to our core value "think global, act local".

    In addition to replacing the old fossil-fueled oil heating registers, Changzhou Zhongheng carried out cleaning work within the TDO and other mechanical improvements before the common line re-start.

    Wang Yuan, project manager at Changzhou Zhongheng, was more than satisfied with the upgrading results and stated: “We decided to do this upgrading with Brueckner as OEM-supplier of our production line and have to say that we have never regretted this decision. Brueckner supported and guided us from the very beginning to the end and the high level of professionalism and in-depth knowledge of the technical team sent by Brueckner Group China was very impressive”.

    Project manager Erik Herold particularly emphasizes the good coordination and independent work execution of the Chinese colleagues, who implemented everything on site to the customer’s full satisfaction: "We really have top colleagues who act quickly and flexibly for the customer and us at all times and are therefore a valuable support for our Brückner Servtec team - a big thumbs up!”.

    The successful conversion to electric heating registers has shown how important continuous improvements are for the long-term efficiency and reliability of film stretching systems. By reducing CO2 emissions, a more environmentally friendly operation is now possible, and Changzhou Zhongheng can be sure that their plant will continue to run optimally in the upcoming years. 

    More News

    This might be interesting for you as well

    13 May 2025

    Hubei Firsta and Brückner Servtec cooperate for major inline coating upgrade

    Agreement officially signed at Chinaplas 2025
    Read more
    06 May 2025

    Manucor transitions to state-of-the-art twin screw extrusion

    Significantly lower energy consumption and maximized film quality as key benefits 
    Read more
    29 Apr 2025

    Brückner Servtec at Chinaplas 2025

    Sustainable upgrading solutions, optimized operations and local on-site services in the focus 
    Read more
    10 Apr 2025

    Inteplast Group relies on NDC thickness gauge technology

    Brückner Servtec supplies advanced thickness measurement solutions 
    Read more
    04 Mar 2025

    Latin American film manufacturer and Brückner Colombia strengthen long-standing partnership

    Read more
    04 Feb 2025

    Diaxon S.A. invests in energy efficiency in film production

    Retrofitted Heat Recovery systems save energy and increase film quality
    Read more
    07 Jan 2025

    Key Position Changes at Brückner Group: Optimal Replacements Through Strategic Personnel Planning

    The Brückner Group, a market leader in engineering of machinery and equipment for processing plastics and alternative materials. Its continuous global success is based on a forward-thinking, long-term personnel strategy. This approach enables the...
    Read more
    Mr. Monojit Bandyopadhya, (middle), Senior Vice President Operations & Country Head, SRF Industries (Thailand) Ltd. and Mr.Kumpol Nateethanasarn,(3rd from left ) Service Director of Brueckner Group Asia- Pacific posed for a photograph with the SRF team in front of the Inline Coater Unit.
    10 Dec 2024

    SRF Industries (Thailand) Ltd. celebrates successful commissioning of first inline coater in Thailand

    Expanded product range and enhanced film quality of BOPP production line
    Read more
    03 Dec 2024

    Brückner Group wins German Sustainability Award for pioneering contributions

    Image Credit ©Dariusz Misztal The Brückner Group has been awarded the German Sustainability Award (DNP) in the category of Plastics and Rubber Industry.
    Read more
    27 Nov 2024

    Manucor continuously relies on Brückner Servtec upgrade competences

    Successful upgrading of Integrated Machine Control (IMC) and Direct Drives enhances line reliability and efficiency   
    Read more
    DISCOVER THE Members of Brückner Group
    Contact
    • Locations worldwide
    • Contact form
    Quick Links
    • Login Member Area
    • News Room
    • Subscribe to Newsletter
    • Events
    • Jobs & Career
    • Downloads
    • Terms and Conditions
    • Compliance
    Solutions
    • Availability
    • Service
    • Film Quality
    • New Products
    • All solutions at a glance
    • Brückner ONE Portal Login
    Find us here
    Brückner Servtec GmbH
    • Imprint
    • Disclaimer
    • Privacy statement
    • GDPR Information
    © Copyright 2025 Brückner Servtec GmbH