servtec.sr.Zum Inhalt servtec.sr.Zum Inhaltsverzeichnis servtec.sr.Zur Hautpnavigation
Brückner Servtec GmbH
Menu
Home
  • Availability
  • Service
  • Film Quality
  • New Products
  • Brückner ONE
    Back Brückner ONE
    • Brückner ONE Docu
    • Brückner ONE Support
    • Brückner ONE Com
    • Brückner ONE Parts
    • Service Packages
    • Client Request
  • About us
    Back About us
    • Management
    • Team
    • Our Key Values
  • Sustainability
    Back Sustainability
    • Ecological
    • Social
    • Economical
    • Initiative "Yes, we care"
  • Compliance
  • Member Area
  • Brückner TEC Talks
  • News
  • Events
  • Career
  • Brückner Servtec Worldwide
  • Platform Companies
Brückner Servtec GmbH
Königsberger Str. 5-7
83313 Siegsdorf
Germany
+49 8662 63-0
servtec@brueckner.com
  • Members of Brückner Group
    Close
    Brückner Group SE
    LEADING
    TO
    SUCCESS
    Find out more
    Brückner Maschinenbau GmbH
    STRETCHING
    THE
    LIMITS
    Find out more
    KIEFEL GmbH
    DRIVING
    YOUR
    PERFORMANCE
    Find out more
    PackSys Global AG
    CREATING
    PACKAGING TECHNOLOGY
    Find out more
    Further information
  • Member Area
  • Career
  • EN
    Deutsch 中文 Español
  • Close

    Search

    What are you looking for?

Contact us!
Table Of Content
    News | Brückner Servtec
    1. Brückner Servtec
    2. News
    3. Considerable savings for Taghleef Industries after electrical upgrade
    Follow us:

    Considerable savings for Taghleef Industries after electrical upgrade

    27 May 2009

    One of the largest manufacturers of BOPP and CPP films in the world, Taghleef Industries, headquartered in Dubai U.A.E., and Brückner Servtec joined their forces once again in a comprehensive electrical upgrade project at one of their three BOPP lines at the site in Dubai.

    In detail, the upgrade package consisted of

    • State-of-the-art dosing control system with Disocont ® electronics by Schenk for better user-friendliness
    • New die bolt temperature control from PSG with compact high-precision control modules and a direct link to Profibus (Process Field Bus) for increased reliability
    • Optimization and tuning of all drives for improved performance and easier maintenance
    • Replacement of the control system with the latest Siemens S7 control system and with it a complete check of all line functions.

    The new control system is much more user-friendly, ensures spare-parts availability and optimizes all functions of the film production process which saves time and material. Besides the already mentioned technical advantages, the project teams achieved additional benefits for Taghleef Industries:

    • Start-up of the BOPP line was ahead of the time schedule
    • Automatic roll change cycle at the winder decreased by more than 50%

    Taghleef Industries is highly satisfied with the results of the project. Mr. Lee Matheson, Project Manager at Taghleef Industries, says: “The project teams have shown an outstanding performance. Due to Brückner’s remarkable expertise in upgrades and the smooth cooperation between Taghleef Industries and Brückner the line was up and running again with a stable production much earlier than scheduled. Brückner’s technical staff gave us a lot of additional assistance in optimizing the line’s parameters. This project made clear once more that time is an essential factor in business: the more we can save, the better it is for us – and with Brückner at our side, we save a lot!”        

    More News

    This might be interesting for you as well

    05 Sep 2025

    12th Speciality Films & Flexible Packaging Global Summit & Exhibition 2025

    Brückner Servtec and Brückner Maschinenbau inform about sustainable packaging innovations, advanced technical film technologies, and next-gen digital tools
    Read more
    16 Jul 2025

    "Keep it running, start coating!"

    2025 Brückner Open House Concludes Successfully 
    Read more
    20 May 2025

    Customer Days at Brueckner Group USA

    Brueckner Group USA sets a new global standard with 2025 Customer Days in Dover, NH
    Read more
    13 May 2025

    Hubei Firsta and Brückner Servtec cooperate for major inline coating upgrade

    Agreement officially signed at Chinaplas 2025
    Read more
    06 May 2025

    Manucor transitions to state-of-the-art twin screw extrusion

    Significantly lower energy consumption and maximized film quality as key benefits 
    Read more
    29 Apr 2025

    Brückner Servtec at Chinaplas 2025

    Sustainable upgrading solutions, optimized operations and local on-site services in the focus 
    Read more
    10 Apr 2025

    Inteplast Group relies on NDC thickness gauge technology

    Brückner Servtec supplies advanced thickness measurement solutions 
    Read more
    11 Mar 2025

    Changzhou Zhongheng successfully upgrades to TDO e-heating register

    Reduced CO2 emissions and less maintenance as key benefits
    Read more
    04 Mar 2025

    Latin American film manufacturer and Brückner Colombia strengthen long-standing partnership

    Read more
    04 Feb 2025

    Diaxon S.A. invests in energy efficiency in film production

    Retrofitted Heat Recovery systems save energy and increase film quality
    Read more
    DISCOVER THE Members of Brückner Group
    Contact
    • Locations worldwide
    • Contact form
    Quick Links
    • Login Member Area
    • News Room
    • Subscribe to Newsletter
    • Events
    • Jobs & Career
    • Downloads
    • Terms and Conditions
    • Compliance
    Solutions
    • Availability
    • Service
    • Film Quality
    • New Products
    • All solutions at a glance
    • Brückner ONE Portal Login
    Find us here
    Brückner Servtec GmbH
    • Imprint
    • Disclaimer
    • Privacy statement
    • GDPR Information
    © Copyright 2025 Brückner Servtec GmbH