servtec.sr.Zum Inhalt servtec.sr.Zum Inhaltsverzeichnis servtec.sr.Zur Hautpnavigation
Brückner Servtec GmbH
Menu
Home
  • Availability
  • Service
  • Film Quality
  • New Products
  • Brückner ONE
    Back Brückner ONE
    • Brückner ONE Docu
    • Brückner ONE Support
    • Brückner ONE Com
    • Brückner ONE Parts
    • Service Packages
    • Client Request
  • About us
    Back About us
    • Management
    • Team
    • Our Key Values
  • Sustainability
    Back Sustainability
    • Ecological
    • Social
    • Economical
    • Initiative "Yes, we care"
  • Compliance
  • Member Area
  • Brückner TEC Talks
  • News
  • Events
  • Career
  • Brückner Servtec Worldwide
  • Platform Companies
Brückner Servtec GmbH
Königsberger Str. 5-7
83313 Siegsdorf
Germany
+49 8662 63-0
servtec@brueckner.com
  • Members of Brückner Group
    Close
    Brückner Group SE
    LEADING
    TO
    SUCCESS
    Find out more
    Brückner Maschinenbau GmbH
    STRETCHING
    THE
    LIMITS
    Find out more
    KIEFEL GmbH
    DRIVING
    YOUR
    PERFORMANCE
    Find out more
    PackSys Global AG
    CREATING
    PACKAGING TECHNOLOGY
    Find out more
    Further information
  • Member Area
  • Career
  • EN
    Deutsch 中文 Español
  • Close

    Search

    What are you looking for?

Contact us!
Table Of Content
    News | Brückner Servtec
    1. Brückner Servtec
    2. News
    3. Upgrading for Nuroll: How to reduce the energy bill
    Follow us:

    Upgrading for Nuroll: How to reduce the energy bill

    28 Jan 2008

    Nuroll S.p.A., a company of world's largest PET producer for packaging, Gruppo M&G, and a leading European manufacturer of BOPET film in Caserta, Italy, successfully launched an upgrading of their “line 1” early this year.
    Concerned about the rising prices for electricity in Italy, Antonio Tufano, the Site Manager of Nuroll, had decided to engage Brückner Servtec with the modification of the line's TDO from electrical to direct oil heating. The benefit of this modification is the much more efficient use of energy. Mr. Tufano: "This modification will strongly reduce the energy bill and the pay back time for this modification is extremely short." Brückner Servtec was responsible for the complete engineering, the supply of heaters, valves and flexible pipes and for supervising the whole installation. Nuroll organized their experienced team of own technicians and those of local subcontractors to carry out the piping and cabeling work. Thanks to the perfect cooperation between the teams the scheduled shutdown time was precisely met and on January 3rd 2008, good film was on winder again. "The accurate preparation and timing are key to success in such a modification, this is why we choose Brückner Servtec as our partner", so Mr. Tufano. "Four years ago we have already done a speed and output upgrade with Brückner Servtec. Upgradings like this make sure that we can increase our competitiveness in a market, which is getting tougher year by year." Brückner says "congratulations" to the successful project!

    More News

    This might be interesting for you as well

    05 Sep 2025

    12th Speciality Films & Flexible Packaging Global Summit & Exhibition 2025

    Brückner Servtec and Brückner Maschinenbau inform about sustainable packaging innovations, advanced technical film technologies, and next-gen digital tools
    Read more
    16 Jul 2025

    "Keep it running, start coating!"

    2025 Brückner Open House Concludes Successfully 
    Read more
    20 May 2025

    Customer Days at Brueckner Group USA

    Brueckner Group USA sets a new global standard with 2025 Customer Days in Dover, NH
    Read more
    13 May 2025

    Hubei Firsta and Brückner Servtec cooperate for major inline coating upgrade

    Agreement officially signed at Chinaplas 2025
    Read more
    06 May 2025

    Manucor transitions to state-of-the-art twin screw extrusion

    Significantly lower energy consumption and maximized film quality as key benefits 
    Read more
    29 Apr 2025

    Brückner Servtec at Chinaplas 2025

    Sustainable upgrading solutions, optimized operations and local on-site services in the focus 
    Read more
    10 Apr 2025

    Inteplast Group relies on NDC thickness gauge technology

    Brückner Servtec supplies advanced thickness measurement solutions 
    Read more
    11 Mar 2025

    Changzhou Zhongheng successfully upgrades to TDO e-heating register

    Reduced CO2 emissions and less maintenance as key benefits
    Read more
    04 Mar 2025

    Latin American film manufacturer and Brückner Colombia strengthen long-standing partnership

    Read more
    04 Feb 2025

    Diaxon S.A. invests in energy efficiency in film production

    Retrofitted Heat Recovery systems save energy and increase film quality
    Read more
    DISCOVER THE Members of Brückner Group
    Contact
    • Locations worldwide
    • Contact form
    Quick Links
    • Login Member Area
    • News Room
    • Subscribe to Newsletter
    • Events
    • Jobs & Career
    • Downloads
    • Terms and Conditions
    • Compliance
    Solutions
    • Availability
    • Service
    • Film Quality
    • New Products
    • All solutions at a glance
    • Brückner ONE Portal Login
    Find us here
    Brückner Servtec GmbH
    • Imprint
    • Disclaimer
    • Privacy statement
    • GDPR Information
    © Copyright 2025 Brückner Servtec GmbH