servtec.sr.Zum Inhalt servtec.sr.Zum Inhaltsverzeichnis servtec.sr.Zur Hautpnavigation
Brückner Servtec GmbH
Menu
Home
  • Availability
  • Service
  • Film Quality
  • New Products
  • Brückner ONE
    Back Brückner ONE
    • Brückner ONE Docu
    • Brückner ONE Support
    • Brückner ONE Com
    • Brückner ONE Parts
    • Service Packages
    • Client Request
  • About us
    Back About us
    • Management
    • Team
    • Our Key Values
  • Sustainability
    Back Sustainability
    • Ecological
    • Social
    • Economical
    • Initiative "Yes, we care"
  • Compliance
  • Member Area
  • Brückner TEC Talks
  • News
  • Events
  • Career
  • Brückner Servtec Worldwide
  • Platform Companies
Brückner Servtec GmbH
Königsberger Str. 5-7
83313 Siegsdorf
Germany
+49 8662 63-0
servtec@brueckner.com
  • Members of Brückner Group
    Close
    Brückner Group SE
    LEADING
    TO
    SUCCESS
    Find out more
    Brückner Maschinenbau GmbH
    STRETCHING
    THE
    LIMITS
    Find out more
    KIEFEL GmbH
    DRIVING
    YOUR
    PERFORMANCE
    Find out more
    PackSys Global AG
    CREATING
    PACKAGING TECHNOLOGY
    Find out more
    Further information
  • Member Area
  • Career
  • EN
    Deutsch 中文 Español
  • Close

    Search

    What are you looking for?

Contact us!
Table Of Content
    News | Brückner Servtec
    1. Brückner Servtec
    2. News
    3. How to make an old film stretching line fit for the future? With a future-proof electrical system!
    Follow us:

    How to make an old film stretching line fit for the future? With a future-proof electrical system!

    12 Nov 2019

    Brückner Servtec upgraded the outdated software architecture of an existing film stretching line and lifted it to a future-proof next level: virtualized server, new PLC software, operating system and visualization in order to increase the line’s availability.

    Brückner has installed the line several decades ago. Since there have been various modifications by the customer over the years, the initial situation was a complex line with various unknown parameters. This made the line and the upgrade project even more complex. But on the strength of Brückner’s large pool of expert knowledge in this field of electrical upgrades, the situation has been managed very successfully as the customer certified a “wonderful and quick job” to Brückner employees. The line produced good film on the winder two days before schedule!

    Top-modern operating system

    The customer, a leading film producer, realized that the status of its software architecture was no longer up-to-date. Only a few experts had the knowledge to do service and provide maintenance support. It was also very difficult to find spare parts for the obsolete components. The operating stations of the line used Windows XP, which was not supported any longer by the supplier and therefore posed a risk to the whole system. Thus, Brückner implemented Windows 10 as operating system in order to benefit from the highest security and the latest functions. Furthermore, the new software is now independent from the hardware due to the virtualized server. In future, the migration of a virtualized system to new hardware will be much easier. This extends the lifecycle and availability of such a system installation considerably. 

    Enhanced control system

    Brückner Servtec already renewed the system several years ago. Within this recent modification, also new state-of-the-art features for controlling the stretching line were implemented.

    Brückner’s approach and commitment to this upgrade project was highly appreciated by the customer. In order to minimize the line’s downtime, the Brückner experts prepared the software in advance for several months. This speeded up the installation at the line tremendously and allowed the team to start much earlier than anticipated. The customer received the new software with the latest functions implemented in the old line. The electrical system of the “old” film stretching line is now ready for the future: state-of-the-art components, easy service and maintenance (also remotely), efficient troubleshooting and future system improvements can be easily implemented.

    This project shows again that we are “going the extra mile” to provide first-class quality solutions for our customers’ sustainable success!

    ALTTEXT

    More News

    This might be interesting for you as well

    20 May 2025

    Customer Days at Brueckner Group USA

    Brueckner Group USA sets a new global standard with 2025 Customer Days in Dover, NH
    Read more
    13 May 2025

    Hubei Firsta and Brückner Servtec cooperate for major inline coating upgrade

    Agreement officially signed at Chinaplas 2025
    Read more
    06 May 2025

    Manucor transitions to state-of-the-art twin screw extrusion

    Significantly lower energy consumption and maximized film quality as key benefits 
    Read more
    29 Apr 2025

    Brückner Servtec at Chinaplas 2025

    Sustainable upgrading solutions, optimized operations and local on-site services in the focus 
    Read more
    10 Apr 2025

    Inteplast Group relies on NDC thickness gauge technology

    Brückner Servtec supplies advanced thickness measurement solutions 
    Read more
    11 Mar 2025

    Changzhou Zhongheng successfully upgrades to TDO e-heating register

    Reduced CO2 emissions and less maintenance as key benefits
    Read more
    04 Mar 2025

    Latin American film manufacturer and Brückner Colombia strengthen long-standing partnership

    Read more
    04 Feb 2025

    Diaxon S.A. invests in energy efficiency in film production

    Retrofitted Heat Recovery systems save energy and increase film quality
    Read more
    07 Jan 2025

    Key Position Changes at Brückner Group: Optimal Replacements Through Strategic Personnel Planning

    The Brückner Group, a market leader in engineering of machinery and equipment for processing plastics and alternative materials. Its continuous global success is based on a forward-thinking, long-term personnel strategy. This approach enables the...
    Read more
    Mr. Monojit Bandyopadhya, (middle), Senior Vice President Operations & Country Head, SRF Industries (Thailand) Ltd. and Mr.Kumpol Nateethanasarn,(3rd from left ) Service Director of Brueckner Group Asia- Pacific posed for a photograph with the SRF team in front of the Inline Coater Unit.
    10 Dec 2024

    SRF Industries (Thailand) Ltd. celebrates successful commissioning of first inline coater in Thailand

    Expanded product range and enhanced film quality of BOPP production line
    Read more
    DISCOVER THE Members of Brückner Group
    Contact
    • Locations worldwide
    • Contact form
    Quick Links
    • Login Member Area
    • News Room
    • Subscribe to Newsletter
    • Events
    • Jobs & Career
    • Downloads
    • Terms and Conditions
    • Compliance
    Solutions
    • Availability
    • Service
    • Film Quality
    • New Products
    • All solutions at a glance
    • Brückner ONE Portal Login
    Find us here
    Brückner Servtec GmbH
    • Imprint
    • Disclaimer
    • Privacy statement
    • GDPR Information
    © Copyright 2025 Brückner Servtec GmbH