servtec.sr.Zum Inhalt servtec.sr.Zum Inhaltsverzeichnis servtec.sr.Zur Hautpnavigation
Brückner Servtec GmbH
Menú
Home
  • Disponibilidad
  • Servicio
  • Calidad de película
  • Nuevos productos
  • Brückner ONE
    Atrás Brückner ONE
    • Brückner ONE Docu
    • Brückner ONE Support
    • Brückner ONE Com
    • Brückner ONE Parts
    • Service Packages
    • Client Request
  • Sustentabilidad
    Atrás Sustentabilidad
    • Ecological
    • Social
    • Economical
    • Iniciativa "Yes, we care"
  • Acerca de nosotros
    Atrás Acerca de nosotros
    • Gerencia
    • Team
    • Nuestros valores clave
  • Cumplimiento
  • Member Area
  • Brückner TEC Talks
  • Noticias
  • Eventos
  • Brückner Servtec en el mundo
  • Plataforma empresas
Brückner Servtec GmbH
Königsberger Str. 5-7
83313 Siegsdorf
Alemania
+49 8662 63-0
servtec@brueckner.com
  • Miembros del Grupo Brückner
    Cerrar
    Brückner Group SE
    LEADING
    TO
    SUCCESS
    Más información
    Brückner Maschinenbau GmbH
    STRETCHING
    THE
    LIMITS
    Más información
    KIEFEL GmbH
    DRIVING
    YOUR
    PERFORMANCE
    Más información
    PackSys Global AG
    CREATING
    PACKAGING TECHNOLOGY
    Más información
    Más informarción
  • Member Area
  • Carrera
  • ES
    Deutsch English 中文
  • Cerrar

    Busca

    Que buscas?

Contact us!
Table Of Content
    Noticias | Brückner Servtec
    1. Brückner Servtec
    2. Noticias
    3. Once again on time re-start after upgrade
    Tenga en cuenta que esta información solo está disponible en inglés
    SÍGUENOS EN:

    Once again on time re-start after upgrade

    14 may 2008

    Turkey’s largest BOPP producer trusts in Brückner Servtec for a comprehensive upgrade of its BOPP 4 line.
    Polinas Plastik Sanayii ve Ticaret A.Ş., Manisa, Turkey, one of the leading manufacturers in the flexible packaging industry, set a tight time schedule for a complete upgrading package: Modification from 4- to 5-layer extrusion, State-of-the-art air knife installation and New thickness gauge and profile control. The target was to limit the line shutdown to a maximum of two weeks. In order to meet this challenging deadline, Polinas perfectly carried out the pre-assembling of the fourth co-extruder and the additionally supplied components according to Brückner drawings, without disrupting the running production. With the line shutdown Brückner Servtec was then responsible for the installation of the melt pipe, the die, the air knife and the thickness gauge.  Under such conditions Brückner’s integrated control system design proves again to yield many advantages. Extrusion, die and thickness control run on one single integrated system. This allows for a complete system set-up and test before the actual installation, which in turn shortens time and man-power required on site for the start-up.  Polinas’s supervisors showed excellent technical know-how and were able to communicate in English on a high level. Communication and cooperation between both sides project teams was excellent and upcoming difficulties were successfully managed efficiently before they could even turn into real problems.  As expected, Polinas and Brückner Servtec met the requirements and after two weeks of installation and intensive check-up, the line was ready for film production again. Mr. Ferit Gencer, Mechanical Maintenance Chief at Polinas, says: “It was important for us, to minimise the shutdown time of the line, even though we knew from the beginning that it would be a difficult job. But with Brückner at our side, we had the right partner and everything went very well. We are very satisfied with the outcome of this cooperation and are looking forward to future joint projects with Brückner.”

    Todas las noticias

    Más información

    20 may 2025

    Customer Days at Brueckner Group USA

    Brueckner Group USA sets a new global standard with 2025 Customer Days in Dover, NH
    Leer más
    13 may 2025

    Hubei Firsta and Brückner Servtec cooperate for major inline coating upgrade

    Agreement officially signed at Chinaplas 2025
    Leer más
    06 may 2025

    Manucor transitions to state-of-the-art twin screw extrusion

    Significantly lower energy consumption and maximized film quality as key benefits 
    Leer más
    29 abr 2025

    Brückner Servtec at Chinaplas 2025

    Sustainable upgrading solutions, optimized operations and local on-site services in the focus 
    Leer más
    10 abr 2025

    Inteplast Group relies on NDC thickness gauge technology

    Brückner Servtec supplies advanced thickness measurement solutions 
    Leer más
    11 mar 2025

    Changzhou Zhongheng successfully upgrades to TDO e-heating register

    Reduced CO2 emissions and less maintenance as key benefits
    Leer más
    04 mar 2025

    Latin American film manufacturer and Brückner Colombia strengthen long-standing partnership

    Leer más
    04 feb 2025

    Diaxon S.A. invests in energy efficiency in film production

    Retrofitted Heat Recovery systems save energy and increase film quality
    Leer más
    07 ene 2025

    Key Position Changes at Brückner Group: Optimal Replacements Through Strategic Personnel Planning

    The Brückner Group, a market leader in engineering of machinery and equipment for processing plastics and alternative materials. Its continuous global success is based on a forward-thinking, long-term personnel strategy. This approach enables the...
    Leer más
    Mr. Monojit Bandyopadhya, (middle), Senior Vice President Operations & Country Head, SRF Industries (Thailand) Ltd. and Mr.Kumpol Nateethanasarn,(3rd from left ) Service Director of Brueckner Group Asia- Pacific posed for a photograph with the SRF team in front of the Inline Coater Unit.
    10 dic 2024

    SRF Industries (Thailand) Ltd. celebrates successful commissioning of first inline coater in Thailand

    Expanded product range and enhanced film quality of BOPP production line
    Leer más
    Descubre los Miembros del Grupo Brückner
    Contacto
    • Ubicaciones alrededor del mundo
    • Formulario de contacto
    Quick Links
    • Login Member Area
    • Cuarto de noticias
    • Suscríbase al boletín
    • Eventos
    • Trabajos y carrera
    • Descargas
    • Términos y condiciones
    • Cumplimiento
    Soluciones
    • Disponibilidad
    • Servicio
    • Calidad de película
    • Nuevo productos
    • Soluciones a la vista
    • Brückner ONE Portal Login
    Encuéntrenos aquí
    Brückner Servtec GmbH
    • Aviso legal
    • Exoneración de responsibilidad
    • Declaración de privacidad
    • Información del RGPD
    © Copyright 2025 Brückner Servtec GmbH