servtec.sr.Zum Inhalt servtec.sr.Zum Inhaltsverzeichnis servtec.sr.Zur Hautpnavigation
Brückner Servtec GmbH
Menü
Home
  • Verfügbarkeit
  • Service
  • Folienqualität
  • Neue Produkte
  • Nachhaltigkeit
    Zurück Nachhaltigkeit
    • Ecological
    • Social
    • Economical
    • Initiative "Yes, we care"
  • Brückner ONE
    Zurück Brückner ONE
    • Brückner ONE Docu
    • Brückner ONE Support
    • Brückner ONE Com
    • Brückner ONE Parts
    • Service Packages
    • Client Request
  • Über uns
    Zurück Über uns
    • Geschäftsführung
    • Team
    • Unsere Werte
  • Compliance
  • Member Area
  • Brückner TEC Talks
  • Aktuelle Nachrichten
  • Events
  • Karriere
  • Brückner Servtec weltweit
  • Plattformgesellschaften
Brückner Servtec GmbH
Königsberger Str. 5-7
83313 Siegsdorf
Deutschland
+49 8662 63-0
servtec@brueckner.com
  • Mitglieder der Brückner-Gruppe
    Schließen
    Brückner Group SE
    LEADING
    TO
    SUCCESS
    Weitere Informationen
    Brückner Maschinenbau GmbH
    STRETCHING
    THE
    LIMITS
    Weitere Informationen
    KIEFEL GmbH
    DRIVING
    YOUR
    PERFORMANCE
    Weitere Informationen
    PackSys Global AG
    CREATING
    PACKAGING TECHNOLOGY
    Weitere Informationen
    Weitere Informationen
  • Member Area
  • Karriere
  • DE
    English 中文 Español
  • Schließen

    Suche

    Wonach suchen Sie?

Kontaktieren Sie uns!
Table Of Content
    1. Brückner Servtec
    2. Aktuelle Nachrichten
    3. Turning a huge challenge into a great success
    Bitte beachten: Diese Seite ist nur auf Englisch verfügbar.
    Folge uns:

    Turning a huge challenge into a great success

    05 Nov 2021

    Going the extra mile: Project report of TDO chain track system upgrade

    One of the largest BOPET film supplier in China today, entered the BOPET market with a 6,7 m film production line from Brückner in 2006. After 15 years in operation, the line suffered from heavy wear in its roller chain system FOK 5.5.4, which caused frequent film breaks. Therefore, the line speed had to be lowered from 300 m/min to around 270-280 m/min to maintain the film quality. However, it was still not satisfying. A chain and clip refurbishment became necessary. 

    Encouraged by the good results of other FOK 5.5.5 refurbishments by Brückner, where the chain and clip systems could be recovered to deliver top performances and were back running at maximum speed. The customer decided to upgrade the line’s TDO chain track system from FOK 5.5.4 to FOK 5.5.5 to get the same excellent performance as other lines plus enjoy simplified spare parts management.

    Although the upgrade parts arrived onsite at the customer in April 2021, the customer wanted to keep the line running to take full advantage of the good BOPET market at that moment. But on June 30, chain problems appeared again, and the line could not run anymore. The upgrade was requested immediately!

    On such short notice, facing extreme manpower shortage, the team of Brückner Group China started urgent coordination and made every effort to have the upgrade experts onsite the next day!

    The task began with a site inspection: unfortunately, more damaged parts were found. The situation was worse than expected, which made this upgrade even more challenging. Quick action had to be taken to get additional necessary spare parts onsite as soon as possible. With the fast support from Brückner Maschinenbau in Germany, a new TDO sprocket tooth lubrication assembly was transferred to the customer from another new line.  Furthermore, Brückner Servtec and Brückner Group China coordinated the procurement of spare parts to replace the damaged connectors, hydraulic stop valves, and dosing units. Finally, all needed parts have been successfully organized, also with the help of the customer’s local source.

    The initial plan was 30 days for the upgrade. The team worked in shifts and made overtime every day to catch up with the tight schedule, also with big support from the customer. Enduring the continuous 37°C high temperature, and the hard-working conditions, Brückner specialists dedicated themselves to the task with only one goal in their mind: The sooner the upgrade is completed, the sooner the line can be back into operation.

    After only 22 days of overloaded work, the teams finally made it! 8 days shorter than initially planned. Great thanks to everyone of the upgrade team for their efforts and contribution. They turned a huge challenge into a great success!

    Today, the BOPET line is running smoothly at full speed and the customer is very satisfied with the excellent performance and enthusiastic about the team’s hard-working spirit.

    We are serving your success! Brückner has once again fulfilled its commitment with professionalism and dedication. This upgrade showed: It pays to go the extra mile.

    ALTTEXT
    ALTTEXT

    Weitere Nachrichten

    Das könnte Sie auch interessieren

    20 Mai 2025

    Customer Days at Brueckner Group USA

    Brueckner Group USA sets a new global standard with 2025 Customer Days in Dover, NH
    Read more
    13 Mai 2025

    Hubei Firsta and Brückner Servtec cooperate for major inline coating upgrade

    Agreement officially signed at Chinaplas 2025
    Read more
    06 Mai 2025

    Manucor transitions to state-of-the-art twin screw extrusion

    Significantly lower energy consumption and maximized film quality as key benefits 
    Read more
    29 Apr 2025

    Brückner Servtec at Chinaplas 2025

    Sustainable upgrading solutions, optimized operations and local on-site services in the focus 
    Read more
    10 Apr 2025

    Inteplast Group relies on NDC thickness gauge technology

    Brückner Servtec supplies advanced thickness measurement solutions 
    Read more
    11 Mär 2025

    Changzhou Zhongheng successfully upgrades to TDO e-heating register

    Reduced CO2 emissions and less maintenance as key benefits
    Read more
    04 Mär 2025

    Latin American film manufacturer and Brückner Colombia strengthen long-standing partnership

    Read more
    04 Feb 2025

    Diaxon S.A. invests in energy efficiency in film production

    Retrofitted Heat Recovery systems save energy and increase film quality
    Read more
    07 Jan 2025

    Wechsel bei Schlüsselpositionen in der Brückner Group: optimale Neubesetzungen dank vorausschauender Personalplanung

    Die Brückner Group agiert mit ihren Business Units als Marktführerin im Engineering sowie Bau von Maschinen und Anlagen, die für die Verarbeitung von Kunststoffen und alternativen Materialien eingesetzt werden. Mitentscheidend für den...
    Read more
    Mr. Monojit Bandyopadhya, (middle), Senior Vice President Operations & Country Head, SRF Industries (Thailand) Ltd. and Mr.Kumpol Nateethanasarn,(3rd from left ) Service Director of Brueckner Group Asia- Pacific posed for a photograph with the SRF team in front of the Inline Coater Unit.
    10 Dez 2024

    SRF Industries (Thailand) Ltd. celebrates successful commissioning of first inline coater in Thailand

    Expanded product range and enhanced film quality of BOPP production line
    Read more
    Entdecken Sie die Mitglieder der Brückner-Gruppe
    Kontakt
    • Standorte weltweit
    • Kontaktformular
    Quick Links
    • Login Member Area
    • Aktuelle Nachrichten
    • Newsletter-Anmeldung
    • Events
    • Jobs & Karriere
    • Downloads
    • AGB
    • Compliance
    Unsere Lösungen für
    • Verfügbarkeit
    • Service
    • Folienqualität
    • Neue Produkte
    • Alle Lösungen auf einen Blick
    • Brückner ONE Portal Login
    Folgen Sie uns auf
    Brückner Servtec GmbH
    • Impressum
    • Haftungsausschluss
    • Datenschutzhinweis
    • DSGVO-Informationen
    © Copyright 2025 Brückner Servtec GmbH